3.24.10. Erection procedure: In addition to being carried out in accordance with the erection plan provided for in section 3.24.9, the work must be carried out according to a procedure established by the employer. The procedure must contain(1) the installation method and the erection stages of the structure;
(2) the measures to be taken to ensure that the structure components are stable; and
(3) the measures to protect workers from falling.
In addition to the requirements provided for in the first paragraph, the erection procedure must include the hoisting procedure provided for in section 3.24.15.